CR Reynolds - Two-Storey Modular Weigh bridge Facility

Commercial

image
image
image
image
image

Two-Storey Modular Weighbridge Facility – Immingham Docks

Project Overview

Phoenix Building Systems Ltd was appointed by CR Reynolds to design, manufacture and install a two-storey modular weighbridge building at Immingham Docks. Acting on behalf of ABP, CR Reynolds required a robust and functional facility to support a wider redevelopment programme at the port. The modular solution delivered by Phoenix included full factory fit-out, transportation, and installation—all delivered in line with the latest Building Regulations.

Project Purpose

This weighbridge facility forms a key part of ABP’s ongoing regeneration plans for the Immingham Docks, designed to modernise and revitalise key operational areas. The modular building is purpose-built to accommodate essential controls for an external sampling arm, as well as internal welfare and utility spaces to support site staff.

Functional Design & Services

Phoenix’s two-storey modular design integrates both operational control and staff amenities into one efficient footprint. Key functional features include:

Control room for external sampling arm operations

Full CCTV installation for security and monitoring

3-phase electrical supplies and isolators to power technical equipment

Welfare provisions, includinga kitchenette and staff rest facilities

External Finish & Access

Given the facility’s industrial setting and function, the external materials were chosen for maximum durability and minimal maintenance.

Cladding: Plastisol-coated steel in a two-tone grey finish

Main body: Goosewing Grey (light grey)

Fascia & accents: Anthracite Grey (dark grey)

External staircase: Powder-coated steel staircase, painted black with yellow nosings for enhanced safety and full Building Regulations compliance

Plastisol-coated steel is a widely used, cost-effective cladding solution that offers long-term durability, weather resistance, and aesthetic flexibility, making it ideal for high-traffic industrial locations like ports.

Outcome

The project was delivered efficiently and to specification, providing ABP with a reliable and regulation-compliant facility to enhance weighbridge operations at Immingham Docks. The modular approach enabled rapid deployment with minimal disruption to the surrounding redevelopment works. Phoenix Building Systems demonstrated their ability to deliver complex, high-spec industrial modular solutions that stand the test of time.

3990

Modular buildings created

20

Years in business

1200

Bespoke Projects created

6

Sector expertise

CASE STUDIES

We’ve created a portfolio of case studies that demonstrate the wide range of styles, layouts and applications of our modular buildings and portable buildings.